Industry

Risk and safety across every project, not every spreadsheet

Principal contractors carry the obligation for everyone on site - their own crews, subcontractors and labour hire. Frontline keeps one register across every project, with the evidence attached.

Built for
Principal contractors and civil
Covers
Projects, depots, mobile crews
Frameworks
WHS Act, ISO 45001, ISO 9001
Live in
24 hours from your export

What does a principal contractor have to be able to prove?

A principal contractor carries the duty for everyone on site - their own crews, subcontractors and labour hire - and has to be able to show, for any given day, what the hazards were, what controls were in place, and that the people doing the work were competent and inducted. That evidence is normally spread across SWMS folders, a subcontractor's inbox and a group chat. Frontline holds one register across every project with the evidence attached to the record it supports, captured from the phone the crew already has.

  • One project register that rolls into a group view without merging exports
  • Subcontractor insurances and inductions visible before mobilisation
  • SWMS versioned, with per-worker acknowledgement recorded
  • Capture works offline and syncs when the device reconnects

The reality

The site moves faster than the paperwork

Construction risk is not static. A project changes shape weekly, the workforce changes daily, and the obligation sits with the principal contractor the entire time.

SWMS live in a folder on the site office laptop. Inductions live in a subcontractor's inbox. Incidents get written on a paper form, photographed, sent to a group chat, and typed up on Friday if someone remembers. When the regulator asks what controls were in place on a specific day, the answer is a search through four systems and a phone call.

None of this is a discipline problem. It is a capture problem: the systems ask the site to stop and fill in a form, so the site fills it in later, or not at all.

  • Capture from the phone in the crew's hand - voice, photo, partial detail
  • Structure applied after capture, so nobody fights a form on a scaffold
  • One register spanning projects, depots and mobile plant

What it handles

The work that actually fills a site manager's week

Project risk registers

One register per project that rolls into a group view, without anyone merging exports at month end.

Subcontractor management

Prequalification, insurances and induction status per company and per person, with expiry visible before mobilisation.

Incidents and near misses

Reported from the phone in seconds. Investigation, actions and corrective work all hang off the original record.

Plant and equipment

Pre-starts, servicing and defects against the asset, so a machine's history travels with it between projects.

Inspections and audits

Scheduled or ad hoc, on your own checklists, with findings that become actions automatically.

SWMS and high-risk work

Current versions on site, acknowledged by the people doing the work, with the acknowledgement recorded.

Training and tickets

Competencies and expiries per person, flagged before a ticket lapses rather than after.

Client and board reporting

The monthly HSE pack generated from live data instead of rebuilt from exports.

Obligation mapping

Where each obligation lives

The question every safety manager asks before a demo: does this cover what we are actually required to do?

ObligationWhat it requiresWhere it lives in Frontline
WHS Act - primary duty of careIdentify hazards, assess and control risk, review controlsRisk register with inherent and residual scoring, controls with owners and verification dates
WHS Regulations - high-risk construction workA SWMS prepared before work starts, reviewed and available on siteDocument control with version history and per-worker acknowledgement
WHS Regulations - notifiable incidentsNotify the regulator, preserve the site, keep records for 5 yearsIncident record with timestamped capture, evidence attached, retention held
ISO 45001 - clause 6.1Documented hazard identification and risk assessment processThe register itself, plus the full change history behind it
ISO 45001 - clause 9.1Monitoring, measurement, analysis and performance evaluationAnalytics with leading and lagging indicators against your own thresholds
Contractor dutiesVerify competency and insurance before workers mobiliseSubcontractor register with expiry tracking and pre-mobilisation checks

Mapping is indicative and reflects the Australian model WHS laws. We'll walk your specific obligations on the call.

Questions we get asked

Will the crews actually use it?

That is the whole design constraint. Capture is voice, photo or a few words from a phone, with structure applied afterwards by the system rather than demanded upfront by a form. If a tool needs a training day, the site will not use it.

Does it work when a site has no signal?

Capture works offline in the browser and syncs when the device reconnects, so a basement level or a remote job does not mean a lost record.

We already use SafetyCulture for inspections. Do we replace it?

No. Inspection results flow in and attach to the risks and assets they relate to. Frontline is the register and the analysis layer over what your teams already capture.

What about subcontractors who won't adopt another system?

They don't need an account. Their companies, people, insurances and inductions are tracked in your register, and they submit through a link rather than a licence.

See it on your sites, your risks, your language.

We'll load a slice of your real data when your spot comes up so you're reacting to your own operation, not a sample one.

  • We take a few teams at a time
  • Configured to your framework
  • No IT project